This process is to purchase Construction of Penzance Creative Cluster, Causewayhead, Penzance, TR18 2ST.
This contract was awarded by ๐ฌ๐ง Cornwall Council for an amount of GBP 4,935,187 to 1 supplier. It was published on 2021-01-19 through open
Transparency in this process is reflected in the detailed publication of all aspects of the contract and its results.
Buying entity๐ฌ๐ง Cornwall Council Buying unitnot reported Publication date2021-01-19 Contest statusnot reported DescriptionThe proposed site is the existing Causewayhead car park in the centre of Penzance, owned by Cornwall Council with plan area for 746 m2.This scheme is part of wider strategy in Penzance to regenerate the town centre by encouraging people to live and work in the town centre, increasing footfall and spend in the main high streets. The project will support the creation of new employment and creates a prominent high-quality gateway into the town.Once the site of an historic reservoir, and later a cattle market, the site is roughly a level portion of land, with level access from Clarence Street to the north and stepped pedestrian access down onto Causewayhead. There is restricted space for construction activities and material storage which will impact construction.The structural solution comprises small piles, foundations and ground beams. The width of the reservoir is such that the building cannot span clear over it without increasing the depth of the structure significantly. The external stone/brick walling to the site is largely retained with minimal disruption, particularly to the lower, older levels. The structure is steel frame and uses concrete hollow planks to form the decks. External walls are largely framed with SFS and clad with Pilkington 'Profilit' glazing or Veio Zinc standing seam cladding. Painted hot rolled metal sections 'edge' the top and bottom of the West block. Internal walls will mostly comprise lightweight dry-lined partitions with fare-faced block walls to plant areas. The pitched roofs are Veio Zinc standing seam the flat roof areas are Bauder on insulation laid to falls.Cornwall Council have appointed a specialist design team, project management and cost consultancy services to deliver the developed design of the project and submit all consents and start contractor engagement. The project is currently at the end of RIBA Stage 4 and is co-funded by ERDF (Match Funding); as a result, the contractor will need to comply with all related requirements and guidance in delivery of an ERDF project including branding requirements.Conditional planning permission has been granted by Cornwall Council under PA20/02440, and it is anticipated that at least some of these conditions will be passed to the contractor for discharge. The contractor will also be responsible for obtaining the targeted BREEAM Credits available during RIBA Stages 5-7 inclusive. All projects funded through ERDF must achieve BREEAM Excellent.The contractor will be responsible for obtaining each of the BREEAM credits targeted during RIBA Stages 5 and 6 and will also be responsible for discharging each of the outstanding planning conditions listed within the works information. The Council anticipates the contract award to take place during April 2021, with completion and occupation of the new facilities during October 2022.This tender seeks to secure a contractor to deliver the required construction works, as outline above and detailed within the works information.Project reference DN513773Awards
This award was granted to Midas Construction Ltd by Cornwall Council for an amount of GBP 4,935,187. The procurement process was conducted through open for the category of works. The award was granted on 2021-05-25. This is award number 1.
| Supplier | Amount | Award date | Award number |
|---|---|---|---|
| ๐ฌ๐ง Midas Construction Ltd | GBP 4,935,187 | 2021-05-25 | 1 |
Market context and opportunities
The execution of this contract allows the entity Cornwall Council to fulfill its public service objectives efficiently.
The open purchase modality ensures that the process is transparent and compliant with regulations.
Transparency in this process is reflected in the detailed publication of all aspects of the contract and its results.
This transparency in public procurement promotes fair competition, prevents corruption, and ensures that public resources are used efficiently for the benefit of citizens.
Additional data
Contract NumberUK_ocds-70d2nz-0355105a-5f64-41e8-a895-65cc18a38d29-award-1Publication date2021-01-19Contract datenot reportedAward date2021-05-25CategoriesworksPurchase modalityopenMethod detailspt_openStatusnot reportedData sources