📑Campbeltown New Quay Expansion.
Procurement process summary
This process is to purchase Campbeltown New Quay Expansion.
This contract was awarded by 🇬🇧 Argyll and Bute Council for an amount of GBP 4,556,097 to 1 supplier. It was published on 2011-12-03 through selective
Transparency in this process is reflected in the detailed publication of all aspects of the contract and its results.
Buying entity🇬🇧 Argyll and Bute Council Buying unitnot reported Publication date2011-12-03 Contest statusnot reported DescriptionCampbeltown New Quay has been used for the shipping of locally manufactured wind turbine components since 2005 and now the manufacturing facility is being enlarged to enable fabrication of larger components. The shipping of these new, larger components requires the use of larger, deeper draughted vessels and to accommodate these vessels the seabed at the inner berth of the New Quay is to be lowered by approximately 3 m. A new quay wall is required for this deeper water. Works are also required at the Old Quay to widen the road to allow the wind turbine component to be transported to the New Quay. The New Quay will be extended by installation of a new steel sheet and tubular combination 'combi' pile wall of approximately 140m in length directly in front of the existing solid and open quay structures. The seabed at the inner berth will be lowered by the dredging of approximately 50,000 tonnes of material. Scour protection mattresses will be installed below water adjacent to the slipway and at the Old Quay. The new pile wall will be tied back to the existing structure and fill will be placed in the void between the old and new pile walls. Ladders, fenders, bollards and cathodic corrosion protection will be installed. The existing reinforced concrete open deck will be widened and partially overlaid and new reinforced concrete capping beams and quay deck ground slabs will be provided as well as area lighting, water points, gates and fencing. The reclamation works at the Old Quay will require the infill of approximately 500 m2 of the harbour and partial realignment of the upper sections of the adjacent masonry harbour wall. The reclamation will be protected from the sea by a sloped precast concrete block revetment. These works will include realigned roadway, paved oversteer areas, footpath, drainage, services and road markings. Argyll and Bute Council is appointing a Principal Contractor for the performance of the works described above based on a design by Argyll and Bute Council's appointed consultants, URS/Scott Wilson.Awards
This award was granted to Bam Nuttall Ltd by Argyll and Bute Council for an amount of GBP 4,556,097. The procurement process was conducted through selective for the category of works. The award was granted on 2011-11-30. This is award number 1.
| Supplier | Amount | Award date | Award number |
|---|---|---|---|
| 🇬🇧 Bam Nuttall Ltd | GBP 4,556,097 | 2011-11-30 | 1 |
Market context and opportunities
The execution of this contract allows the entity Argyll and Bute Council to fulfill its public service objectives efficiently.
The selective purchase modality ensures that the process is transparent and compliant with regulations.
Transparency in this process is reflected in the detailed publication of all aspects of the contract and its results.
This transparency in public procurement promotes fair competition, prevents corruption, and ensures that public resources are used efficiently for the benefit of citizens.
Additional data
Contract NumberUK_ocds-70d2nz-5559d4b2-22cb-4c9a-9605-22182c9ec706-award-1Publication date2011-12-03Contract datenot reportedAward date2011-11-30CategoriesworksPurchase modalityselectiveMethod detailspt_restrictedStatusnot reportedData sources
Sociedad.info publishes data from official sources, in compliance with public information access laws. Public access to this data is a civic right that helps hold government accountable. This data, including names and identifiers, is already public in the official source. Read our privacy policy.