📑Assessment of Licensee Internal Hazard Methodologies
Resumo do processo de contratação
Este processo é para comprar Assessment of Licensee Internal Hazard Methodologies.
Este contrato foi adjudicado por 🇬🇧 Health and Safety Executive (HSE) por um montante de GBP 17,345 a 1 fornecedor. Foi publicado em 2014-11-13 através de open
A transparência neste processo reflete-se na publicação detalhada de todos os aspetos do contrato e dos seus resultados.
Entidade compradora🇬🇧 Health and Safety Executive (HSE) Unidade compradoranão reportado Data de publicação2014-11-13 Estado do concursonão reportado Descrição1 BACKGROUND TO THE PROJECT 1.1 Nuclear New Build Generation Company (NNB GenCo) is planning to construct two European Pressurised Reactor (EPRs(tm)) at Hinkley Point (HPC). The Hinkley Point C Construction Intervention Strategy for the UK EPR(tm) sets out ONR's approach to regulating the construction phase and presents the management expectations and framework for ONR intervention planning. 1.2 The strategy objectives are to: * Secure ONR's regulation of the construction and installation by NNB GenCo of two EPRTM !reactor units at Hinkley Point C; * Implement a programme of interventions or multi-discipline team inspections aimed at gathering evidence to form a judgement on the capability of the NNB GenCo organisation and the effectiveness of its management arrangements. 1.3 Internal hazards are those hazards to plant, structures and personnel which originate within the site boundary but are external to the process in the case of nuclear chemical plant or primary circuit in the case of power reactors. That is, the licensee has control over the initiating event in some form. Internal hazards include internal flooding, fire, toxic gas release, collapses, dropped loads, impacts from vehicular transport and explosion / missiles. 1.4 Internal hazards are an important nuclear safety consideration in the preparation by the Licensee of the nuclear safety case (Pre-Construction Safety Report (PCSR)) covering construction of the EPRs. The PCSR is being developed in stages, and the internal hazards analyses will be developed as the design progresses but it is important the regulator ensures that the design is progressing in a manner that ensures risk is maintained as low as reasonable practicable. 1.5 ONR's role in this technical area is to undertake sufficient assessment of safety submissions and supporting methodologies to form a view as to whether NNB GenCo has, provided an adequate demonstration of nuclear safety. 1.6 In order to build confidence in the licensee and their ability to identify, classify and protect against the propagation of internal hazards it is important to carry out an exercise to assess their methodologies. This ensures at an early stage that we are content with the methodologies that will be applied as the design progresses. 1.7 To date, methodologies provided by the licensee include the following: * Internal missiles methodology (10 pages) * Dropped or impacting loads methodology (10 pages) * Fire studies methodology (30 pages) * Internal flood methodology (51 pages) * High energy line break (HELB) methodology (31 pages)Adjudicações
Esta adjudicação foi concedida a AMEC por Health and Safety Executive (HSE) por um montante de GBP 17,345. O processo de contratação foi conduzido através de open para a categoria de Não disponível. A adjudicação foi concedida em 2014-10-06. Esta é a adjudicação número 1.
| Fornecedor | Montante | Data de adjudicação | Número de adjudicação |
|---|---|---|---|
| 🇬🇧 AMEC | GBP 17,345 | 2014-10-06 | 1 |
Contexto de mercado e oportunidades
A execução deste contrato permite que a entidade Health and Safety Executive (HSE) cumpra os seus objetivos de serviço público de forma eficiente.
A modalidade de compra open garante que o processo é transparente e conforme às regulamentações.
A transparência neste processo reflete-se na publicação detalhada de todos os aspetos do contrato e dos seus resultados.
Esta transparência na contratação pública promove a concorrência justa, previne a corrupção e garante que os recursos públicos são utilizados de forma eficiente para o benefício dos cidadãos.
Dados adicionais
Número do ContratoUK_ocds-70d2nz-d4b262b0-8700-4258-a7a2-a0f6fba68fa1-award-1Data de publicação2014-11-13Data do contratonão reportadoData de adjudicação2014-10-06CategoriasModalidade de compraopenDetalhes do métodoPT_OPENEstadonão reportadoFontes de dados
Sociedad.info publica dados de fontes oficiais, em cumprimento das leis de acesso à informação pública. O acesso público a esses dados é um direito cidadão que ajuda no controle do governo. Esses dados, incluindo nomes e identificadores, já são públicos na fonte oficial. Leia nossa política de privacidade.

