📑City Centre Campus Phase 2 Main Contractor.
Resumen del proceso de compra
Este proceso es para comprar City Centre Campus Phase 2 Main Contractor.
Este contrato fue adjudicado por 🇬🇧 Birmingham City University por un monto de GBP 46,230,000 a 1 proveedor. Fue publicado el 2013-05-14 mediante selective
La transparencia en este proceso se refleja en la publicación detallada de todos los aspectos del contrato y sus resultados.
Entidad compradora🇬🇧 Birmingham City University Unidad compradorano reportado Fecha de publicación2013-05-14 Estatus del concursono reportado DescripciónThe University requires a Main Contractor to design, procure, construct, commission and handover to the University Phase Two of the new City Centre Campus, which will consist of approximately 25,000 m2 (GEA) of new build and in time for occupation by September 2015. This is part of a potential wider development within Birmingham to allow the University the opportunity to deliver its estates strategy over the long term. The Scope of Works may include: Site Preparation and Enabling Works, Demolition. Design Procurement and Construction in a single phase Refurbishment of a grade 2 listed public house FFandE Fit-out including legacy equipment External Works The university wishes to see the main contractor partner with a specialist Mechanical and Electrical contractor as part of the process due to the complex and integrated nature of the University ICT and services proposals. Note the Mechanical and Electrical contractor does not need to be exclusive with a single main contractor and may partner with a number of main contractors should they wish Other activities which may remain outside the scope of the Main contractor: The migration of existing Staff and staff equipment to the Phase two of the new development may be carried out by a specialist company and may be outside the scope of the main contract. Statutory Authority services maybe diverted out of the phase 2 build area by the University or maybe included as part of the main contractors enabling package. The appointed design team, under the direction of the Universitys Estates Department, will develop the design for the full planning application of pproximately 25,000 m2 (GEA). The design team will be novated to the main contractor at contract award. The main contractor shall be presented with a 3D Building Information Model (BIM) at RIBA stage E and will be responsible for its development during the construction phase for issue to the University as part of the completion Operating and Maintenance manuals. The model shall be fully populated for use as part of the maintenance procedure. The contractor and all necessary subcontractors shall fully comply with the requirements of BSRIA Softlandings Guidelines. The Softlandings procedure shall be managed directly by the University Estates Team. The new build shall achieve BREEAM Excellent as a minimum with an EPC of 35 (B) maximum. Main contractor shall comply fully with the requirements of both the Considerate Contractor Scheme and the University policy on WRAP.Adjudicaciones
Esta adjudicación fue otorgada a Willmott Dixon Construction Limited por Birmingham City University por un monto de GBP 46,230,000. El proceso de contratación se realizó mediante selective para la categoría de works. La adjudicación fue otorgada el 2013-05-08. Esta es la adjudicación número 1.
| Proveedor | Monto | Fecha de adjudicación | Número de adjudicación |
|---|---|---|---|
| 🇬🇧 Willmott Dixon Construction Limited | GBP 46,230,000 | 2013-05-08 | 1 |
Contexto del mercado y oportunidades
La ejecución de este contrato permite a la entidad Birmingham City University cumplir con sus objetivos de servicio público de manera eficiente.
La modalidad de compra selective asegura que el proceso sea transparente y conforme a la normativa.
La transparencia en este proceso se refleja en la publicación detallada de todos los aspectos del contrato y sus resultados.
Esta transparencia en la contratación pública promueve la competencia justa, previene la corrupción y asegura que los recursos públicos se utilicen eficientemente para el beneficio de la ciudadanía.
Datos adicionales
Código de contratoUK_ocds-70d2nz-60d5960f-56e2-403c-aaf2-b62bdd321b32-award-1Fecha de publicación2013-05-14Fecha del contratono reportadoFecha de adjudicación2013-05-08CategoríasworksModalidad de compraselectiveDetalles del métodopt_restrictedEstadono reportadoFuentes de datos
Sociedad.info publica datos de fuentes oficiales, en cumplimiento de leyes de acceso a la información pública. El acceso público a estos datos es un derecho ciudadano que ayuda al control del gobierno. Estos datos, incluyendo nombres e identificadores, ya son públicos en la fuente oficial. Lea nuestra política de privacidad.

