📑City Centre Campus Phase 2 Main Contractor.
Resumo do processo de contratação
Este processo é para comprar City Centre Campus Phase 2 Main Contractor.
Este contrato foi adjudicado por 🇬🇧 Birmingham City University por um montante de GBP 46,230,000 a 1 fornecedor. Foi publicado em 2013-05-14 através de selective
A transparência neste processo reflete-se na publicação detalhada de todos os aspetos do contrato e dos seus resultados.
Entidade compradora🇬🇧 Birmingham City University Unidade compradoranão reportado Data de publicação2013-05-14 Estado do concursonão reportado DescriçãoThe University requires a Main Contractor to design, procure, construct, commission and handover to the University Phase Two of the new City Centre Campus, which will consist of approximately 25,000 m2 (GEA) of new build and in time for occupation by September 2015. This is part of a potential wider development within Birmingham to allow the University the opportunity to deliver its estates strategy over the long term. The Scope of Works may include: Site Preparation and Enabling Works, Demolition. Design Procurement and Construction in a single phase Refurbishment of a grade 2 listed public house FFandE Fit-out including legacy equipment External Works The university wishes to see the main contractor partner with a specialist Mechanical and Electrical contractor as part of the process due to the complex and integrated nature of the University ICT and services proposals. Note the Mechanical and Electrical contractor does not need to be exclusive with a single main contractor and may partner with a number of main contractors should they wish Other activities which may remain outside the scope of the Main contractor: The migration of existing Staff and staff equipment to the Phase two of the new development may be carried out by a specialist company and may be outside the scope of the main contract. Statutory Authority services maybe diverted out of the phase 2 build area by the University or maybe included as part of the main contractors enabling package. The appointed design team, under the direction of the Universitys Estates Department, will develop the design for the full planning application of pproximately 25,000 m2 (GEA). The design team will be novated to the main contractor at contract award. The main contractor shall be presented with a 3D Building Information Model (BIM) at RIBA stage E and will be responsible for its development during the construction phase for issue to the University as part of the completion Operating and Maintenance manuals. The model shall be fully populated for use as part of the maintenance procedure. The contractor and all necessary subcontractors shall fully comply with the requirements of BSRIA Softlandings Guidelines. The Softlandings procedure shall be managed directly by the University Estates Team. The new build shall achieve BREEAM Excellent as a minimum with an EPC of 35 (B) maximum. Main contractor shall comply fully with the requirements of both the Considerate Contractor Scheme and the University policy on WRAP.Adjudicações
Esta adjudicação foi concedida a Willmott Dixon Construction Limited por Birmingham City University por um montante de GBP 46,230,000. O processo de contratação foi conduzido através de selective para a categoria de works. A adjudicação foi concedida em 2013-05-08. Esta é a adjudicação número 1.
| Fornecedor | Montante | Data de adjudicação | Número de adjudicação |
|---|---|---|---|
| 🇬🇧 Willmott Dixon Construction Limited | GBP 46,230,000 | 2013-05-08 | 1 |
Contexto de mercado e oportunidades
A execução deste contrato permite que a entidade Birmingham City University cumpra os seus objetivos de serviço público de forma eficiente.
A modalidade de compra selective garante que o processo é transparente e conforme às regulamentações.
A transparência neste processo reflete-se na publicação detalhada de todos os aspetos do contrato e dos seus resultados.
Esta transparência na contratação pública promove a concorrência justa, previne a corrupção e garante que os recursos públicos são utilizados de forma eficiente para o benefício dos cidadãos.
Dados adicionais
Número do ContratoUK_ocds-70d2nz-60d5960f-56e2-403c-aaf2-b62bdd321b32-award-1Data de publicação2013-05-14Data do contratonão reportadoData de adjudicação2013-05-08CategoriasworksModalidade de compraselectiveDetalhes do métodopt_restrictedEstadonão reportadoFontes de dados
Sociedad.info publica dados de fontes oficiais, em cumprimento das leis de acesso à informação pública. O acesso público a esses dados é um direito cidadão que ajuda no controle do governo. Esses dados, incluindo nomes e identificadores, já são públicos na fonte oficial. Leia nossa política de privacidade.